Project Update Dredging

 
Updated 2:30 p.m. Dec. 12, 2017
 
Bayside Dredging Projects
 

Mobile Dredging and Video Pipe, Inc. has completed work to hydraulically dredge Carnival Bayou (between W. 16th Street and W. 17th Street) and removed 17,430 cubic yards of material. Dredging work began on Oct. 16, 2017 and was completed by early December. Initial bathymetric surveys indicate depth requirements were met or exceeded. Trident Marine Piling will remove material from a narrow “buffer zone” that rims the lagoon (as part of the project’s expense). Any owner interested in making private arrangements for dredging of private slips at their own expense can call Joe Stewart from Trident at 609-703-7466 for an estimate.

 